PROGRESS CRIT 1
DATE : 2 NOVEMBER 2015
TIME : 10.25 A.M.
VENUE : GROUP 4 STUDIO RUS104, SCHOOL OF HBP, UNIVERSITI SAINS MALAYSIA
LECTURER:
- ASSOC. PROF. DR. FUZIAH IBRAHIM
- DR. SITI SALWA MOHD ISHAK
- DR. MARIATI TAIB
PRESENCE :
- AZIMAN RAZIQ BIN RIZAMAN (CHAIRMAN)
- AIMI ZAHIRAH BINTI ZULKARNAIN (ASSIST. CHAIRMAN)
- NOR SYAFQAH ATHIRAH BINTI MOHD SHAIFULLAH (SECRETARY)
- WEE CHEW TENG (ASSIST. SECRETARY)
- TAN JO YEN (TREASURES)
- LEE TER SOON
- NG YII ROU
- AZREEN SABRINA BINTI AB HALIM
- FAIZ SOLEHIN BIN SHAFIKHULLAH
- FATIN NABILA BINTI ABDULL RAHMAN
- GOH SU CHEN
- HANISAH BINTI AMIRUDDIN
- NUR NABILAH BINTI MOHAMAD BAKHTIAR
- MUHAMMAD HAKEEM BIN MOHD MAHAYUDDEEN
- GOH JIE XIN
- NUR SYAHIRAH BINTI ALI
- NURMAN BIN RAZALI
LECTURER REMARK
The lecturer begins the crit session with salam
remarks to the members who present in
the meeting and invited group 4 for the site analysis prentation.
MINUTE 1 : PREPARE FOR THE CRIT SESSION
Chairman give a flow of presentation to all
member before presentation.
Action: Chairman
MINUTE 2 : PRESENTATION BY MEMBER
Chairman started the presentation by introduce
the site, and the point of the SWOT analysis. Each of member by site tasks come
out with the data from the task such as the dimension and the orientation of
the site, existing structure, services, soil profile, temperature and humidity.
Our group also presentation the future area for development. From the material
selection team, they decide to use piling for Royal Pavilion and makes our
assumption for the site.
Action: All member
MINUTE 3 : COMMENT AND FEEDBACK FROM LECTURER
After the presentation, studio masters were
giving comment and suggestion for improving
our progress. Comments and suggestion by
studio master :
- Do not make assumption of the site and all the data must have a fact.
- The presentation have lack of site analysis (SWOT analysis), all the member from all major must have a sense to the site.
- The area for the future development is not suitable because near to Y junction of the pathway.
- For the vegetation, if necessary to cut the tree for development.
- The pile as the foundation of the Royal Pavilion is not suitable, so all members need to do more precendent studies of the structure used.
- Lack of communication and team work.
Action: All Group 4's studio master
After the Crit Session, all member stay back for proceed the meeting.