Meeting Report
MINUTE
OF MEETING GROUP 4B SITE NO.8
Date:
3 November 2015 (Tuesday)
Time:
9.00 pm
Venue:
Studio Architecture RUS 104.HBP,USM
Presence:
Aziman Raziq Bin Rizaman ( Chairman )
Aimi Zahirah Binti Zulkarnain (Assist.
Chairman)
Lee Ter Soon
Ng Yii Rou
Azreen Sabrina Binti Ab Halim
Faiz Solehin Bin Shafikhullah
Fatin Nabila Binti Abdull Rahman
Goh Su Chen
Hanisah Binti Amiruddin
Nur Nabilah Binti Mohamad Bakhtiar
Muhammas Hakeen Bin Mohd Mahayuddeen
Nor Syafiqah Athirah Binti Mohd Shaifulah (Secretary)
Wee Chew Teng (Assist.Secretary)
Nur Syahirah Binti Ali
Nurman Bin Razali
Tan Jo yen (Treasures)
CHAIRMAN REMARK
The chairman begins the meeting with
salam remarks and welcome to the members who present in the meeting.
MINUTE 1 : DIVIDE THREE GROUP FOR
DISCUSSION
After the Crit Session on Monday, we modify our problem of the site analysis. The chairman had came out
with the solutions to solve those problems. Chairman had rearranged the duty of
the members.
All member are divided to three group.
First Group 1 for the dimension. Second Group 2 for facilities. All member are
start the works by following the task that divided. All member is discussing by
sub-group and sketch or do into the A1 butter paper for the Crit Session.
·
Group 1 for the dimension (Tally information and location of
site analysis) :
Task A - Dimension and orientation site
Task F - Topography and landscape
Task G - Condition facility traffic and pedestrian
Task C - Profile of land and soil
The information of Task A,F,G are collect and combine it for the layout
plan. The layout plan of the site is draw by the group member with using the
scale 1:100.
·
Dimension of the site :12 m
·
Dimension of the pavement : 2.5 m
·
Dimension of the road : 7 m
·
Type of trees : 1) Angsana
tree
Height: 30 m
- 48 m, Pterocarpus indicus, Hardwood.
2) Bunga
Tanjung
Height: 3 m,
Tradisional medicinal (leaf), For shade
3) Coconut Trees
Height: 6
m-30 m, member of family arecaceae(palm family),
products for furnising and decorative(leaf)
4) Pokok
Dedaun Alam
Pelargonium radula,decorative leaf, repel mosquitoes because of the strong like aerosal.
·
Type of soil : Fine soil sand
1) Site - wet and sticky
- dry soil
2) North - Dry soil
3) South - Dry soil
Figure 4: The Layout Plan
·
Second Group 2 for facilities :
Task B - The existing structures in and around the site
Task D - Services in the
vicinity of the site
*playground,information
board,pedestrian walkway, bench, lamp post, rubbish bin,gazebo.
Figure 5: Lamp Post Figure 6: Pedestrian Walkway
Task H - Public facilities
*public phone, public toilet
Figure 5: Lamp Post Figure 6: Pedestrian Walkway
·
Third Group 3 for condition:
Task
E- Temperature, humidity and wind
1) Temperature:
Max-35C
Min-31.9C
Average-
31.35C
2) Humidity :
Max-63.6%
Min- 53.6%
Average- 53.67%
3) Wind :
Max-5.5m/s(west)-around 2 pm
Min-0.0m/s(south)-around 11.30 pm
Task I - Obstacles on site and around the site
-All of this need to proceed to A1 butter paper
for the crit session.
-All member must present to other member what they do after complete in butter paper.
-All member must present to other member what they do after complete in butter paper.
Action:
All member
MINUTE 2 : IDEA AND CONCEPT OF THE PAVILION
Chairman remind all member needs to come out with idea for
the Royal Pavilion.
Action:
All Member
MINUTE 3 : REPORT UPDATE
Chairman mention
secretary for updating the progress report.
Action:
Nor Syafiqah Athirah
Wee Chew Teng
Wee Chew Teng
MINUTE 4 : SWOT
ANALYSIS
Each of the member
brain storm for the swot analysis of the site.
1. Strength
·
Scenery (Lake)
· Availability of road
·
Abundance of facilities
·
Walkway ; access to
pavilion
·
Flat land surface
·
Lake ; reduce
surrounding temperature
·
Near to the parking
space
2. Weakness
·
Small site
·
Out dated
facilities
·
Near to the lake
(Safety)
3. Opportunity
·
High radiation ;
installation of photovoltaic cell (Good for GBI) ; natural lighting
·
Suitable ambiance for
relaxing
4. Treat
·
Noise pollution
(Event)
·
High Traffic Volume
during event
Action :
All
members
The chairman closes the
meeting with remarks of thank you to the members who attend and the next meeting will be held on this Wednesday for the precedent
studies, concept design sketch and bubble diagram. Design team and planner compulsory
attend.