Meeting 2

Meeting Report
MINUTE OF MEETING  GROUP 4B SITE NO.8

Date: 30 October 2015 (Friday)
Time: 10.10 am
Venue: Taiping Lake Garden

______________________________________________________________

Presence:
Aziman Raziq Bin Rizaman ( Chairman )
Aimi Zahirah Binti Zulkarnain
Lee Ter Soon
Ng Yii Rou
Azreen Sabrina Binti Ab Halim
Faiz Solehin Bin Shafikhullah
Fatin Nabila Binti Abdull Rahman
Goh Su Chen
Hanisah Binti Amiruddin
Nur Nabilah Binti Mohamad Bakhtiar
Muhammas Hakeen Bin Mohd Mahayuddeen
Nor Syafiqah Athirah Binti Mohd Shaifulah
Wee Chew Teng
Goh Jie Xin
Nur Syahirah Binti Ali
Nurman Bin Razali
Tan Jo yen

Chairman Remark
The chairman begins the meeting with salam remarks and welcome to the members who present in the meeting.


Minute 1: Divided task of site analysis to group member
·         Chairman divided the task for site analysis to group member
·         Everyone are divided into sub-groups. Each sub-group consists of  2 or 3 students to carry their own task requirement.
Analysis of project site :
TASK
ACTOR
SITE ORIENTATION & SIZE
- Aziman Raziq Bin Rizaman
- Aimi Zahirah Binti Zulkarnain

THE EXISTING STRUCTURES IN AND AROUND THE SITE
- Hanisah Binti Amiruddin
- Nur Nabilah Binti Mohamad      Bakhtiar

PROFILE OF LAND, SOIL CONDITIONS & TYPE, GL & UNDERGROUND WATER LEVEL
-Tan Jo yen
-Goh Jie Xin

SERVICES (SERVICES) IN THE VICINITY OF THE SITE (WATER, FIRE, DRAINAGE, FIRE)
-Faiz Solehin Bin Shafikhullah
-Nurman Bin Razali

TEMPERATURE, HUMIDITY AND WIND
-Fatin Nabila Binti Abdull Rahman
-Azreen Sabrina Binti Ab Halim

TOPOGRAPHY & LANDSCAPE (PLANTS IN & AROUND THE SITE)
-Muhammas Hakeen Bin Mohd Mahayuddeen

ENVIRONMENT FACILITY TRAFFIC & PEDESTRIAN ACCESS TO & FROM THE SITE
-Lee Ter Soon
-Goh Su Chen

 PUBLIC FACILITIES (BUS STOP), SHOPS, POST OFFICE, CLINIC.
-Nor Syafiqah Athirah Binti Mohd Shaifulah
-Nur Syahirah Binti Ali

OBSTACLES ON SITE AND AROUND THE SITE
-Ng Yii Rou
-Wee Chew Teng


Action: Aziman(Chairman)

Minute 2: Brief for site analysis
·          Explain what we need to do for the site analysis with each task.
- collect data
- take photo to the site
- do measurement to the site (dimension)
- do research for the SWOT analysis
Action: Aziman(Chairman)

Minute 2: Distribution Measuring Equipment
·          Equipment provided to members of the group  
·          Explain how to use the equipment to the member

Action: Aziman(Chairman)
Minute 3 : Explaination by Lecture
·         Lecture explain more details about the task given.  
·         Q&A section with lecturer
Action :Lecturer


Minute 4: Execution of respective job
Member of the group is do research, site analysis and data collection according  to their job scope. Time frame of one and half hour is given.

Action: All member

Minute 5: Taking photo from the site
Member of the group take the initiative to take relevent relevant photos around the site.

                                           Figure2: The Lake of the Taiping Lake Garden
Figure1: Site No.8(Group 4B)

Action: All member
                                                                                                               
Minute 5: Result of the site analysis
·         Do presentation by member of group .
·         Share the data and result of the site analysis .
·         Combined and compared all the data and result of the site analysis .
·         Find out the problem and solution of the site .
·         Chairman and construction management collect all the data and result of site analysis from each task .
·         Finalise all  the data of site analysis and proceed to A1 butter butter

Action: All member


The chairman closes the meeting with remarks of thank you to the members who attend the meeting and next meeting will be on next Monday after the Studio Crits Session at Studio 100.

No comments:

Post a Comment