Meeting Report
MINUTE OF MEETING GROUP 4B
SITE NO.8
Date: 30 October 2015 (Friday)
Time: 10.10 am
Venue: Taiping Lake Garden
______________________________________________________________
Presence:
Aziman Raziq Bin Rizaman ( Chairman
)
Aimi Zahirah Binti Zulkarnain
Lee Ter Soon
Ng Yii Rou
Azreen Sabrina Binti Ab Halim
Faiz Solehin Bin Shafikhullah
Fatin Nabila Binti Abdull Rahman
Goh Su Chen
Hanisah Binti Amiruddin
Nur Nabilah Binti Mohamad Bakhtiar
Muhammas Hakeen Bin Mohd Mahayuddeen
Nor Syafiqah Athirah Binti Mohd
Shaifulah
Wee Chew Teng
Goh Jie Xin
Nur Syahirah Binti Ali
Nurman Bin Razali
Tan Jo yen
Chairman Remark
The chairman begins the meeting with
salam remarks and welcome to the members who present in the meeting.
Minute 1: Divided task of site analysis to group member
·
Chairman divided the task for site analysis
to group member
·
Everyone are divided into
sub-groups. Each sub-group consists of 2
or 3 students to carry their own task requirement.
Analysis of project site :
TASK
|
ACTOR
|
SITE ORIENTATION & SIZE
|
-
Aziman Raziq Bin Rizaman
-
Aimi Zahirah Binti Zulkarnain
|
THE EXISTING STRUCTURES IN AND AROUND THE SITE
|
-
Hanisah Binti Amiruddin
-
Nur Nabilah Binti Mohamad Bakhtiar
|
PROFILE OF LAND, SOIL CONDITIONS & TYPE, GL &
UNDERGROUND WATER LEVEL
|
-Tan Jo yen
-Goh Jie Xin
|
SERVICES (SERVICES) IN THE VICINITY OF THE SITE (WATER,
FIRE, DRAINAGE, FIRE)
|
-Faiz Solehin Bin Shafikhullah
-Nurman Bin Razali
|
TEMPERATURE, HUMIDITY AND WIND
|
-Fatin Nabila Binti Abdull Rahman
-Azreen Sabrina Binti Ab Halim
|
TOPOGRAPHY & LANDSCAPE (PLANTS IN & AROUND THE
SITE)
|
-Muhammas Hakeen Bin Mohd Mahayuddeen
|
ENVIRONMENT FACILITY TRAFFIC & PEDESTRIAN ACCESS TO
& FROM THE SITE
|
-Lee Ter Soon
-Goh Su Chen
|
PUBLIC
FACILITIES (BUS STOP), SHOPS, POST OFFICE, CLINIC.
|
-Nor Syafiqah Athirah Binti Mohd Shaifulah
-Nur Syahirah Binti Ali
|
OBSTACLES ON
SITE AND AROUND THE SITE
|
-Ng Yii Rou
-Wee Chew Teng
|
Action:
Aziman(Chairman)
Minute 2: Brief for site analysis
·
Explain
what we need to do for the site analysis with each task.
-
collect data
- take photo
to the site
- do
measurement to the site (dimension)
- do
research for the SWOT analysis
Action:
Aziman(Chairman)
Minute 2: Distribution Measuring Equipment
· Equipment provided to members of the group
·
Explain how to use the equipment to the member
Action:
Aziman(Chairman)
Minute
3 : Explaination by Lecture
·
Lecture explain more details about
the task given.
·
Q&A
section with lecturer
Action
:Lecturer
Minute 4: Execution of respective job
Member of the group
is do research, site analysis and data collection according to their job scope. Time frame of one and half
hour is given.
Action: All member
Minute 5: Taking photo from the site
Member of the group take the initiative to take relevent relevant photos around the site.
Figure2: The Lake of the Taiping Lake Garden
Figure1: Site No.8(Group 4B)
Action: All member
Minute 5: Result
of the site analysis
·
Do presentation by member of group .
·
Share the data and result of the site
analysis .
·
Combined and compared all the data and result
of the site analysis .
·
Find out the problem and solution of the site
.
·
Chairman and construction management collect
all the data and result of site analysis from each task .
·
Finalise all
the data of site analysis and proceed to A1 butter butter
Action: All member
The chairman closes the meeting with remarks of thank you
to the members who attend the meeting and
next meeting will be on next Monday after the Studio Crits Session at Studio
100.
No comments:
Post a Comment