Meeting Report
MINUTE OF MEETING GROUP 4B
SITE NO.8
Date: 02 November 2015 (Monday)
Time: 12.00 pm
Venue: Studio RUS 104 100
______________________________________________________________
Presence:
Aziman Raziq Bin Rizaman
( Chairman )
Aimi Zahirah Binti
Zulkarnain (Assist.
Chairman)
Lee Ter Soon
Ng Yii Rou
Azreen Sabrina Binti Ab
Halim
Faiz Solehin Bin
Shafikhullah
Fatin Nabila Binti
Abdull Rahman
Goh Su Chen
Hanisah Binti Amiruddin
Nur Nabilah Binti
Mohamad Bakhtiar
Muhammas Hakeen Bin Mohd
Mahayuddeen
Nor Syafiqah Athirah
Binti Mohd Shaifulah (Secretary)
Wee Chew Teng (Assist.Secretary)
Nur Syahirah Binti Ali
Nurman Bin Razali
Tan Jo yen (Treasures)
Chairman Remark
The chairman begins the meeting with
salam remarks and welcome to the members who present in the meeting.
Minute 1: Feedback from the lecturer
about the progress
·
Discussion the problem of the
site analysis with group member
·
All member of Group 4B are list down the problem of the site analysis
that studio master give comment during the studio crit session.
·
All member are share and discussion about the problem of site analysis
Problem of the site and site analysis:
1. The site is small ( small place )
2. Is difficult for us to built a pavilion at the
small place
3. No parking area
4. Data and information of the site collected
incomplete
5. Do not have a conclusion for the site analysis
6. Conflicts on the main issue of the site
7. Lack of communication and team work
8.
The area
for the future development is not suitable because near to Y junction of the
pathway.
·
All member of 4B are share the idea and find out the best way to solve
the problem .
Action: All member of Group 4B
Minute 2: Distribution the work ( Next things
we need to do )
After the Crit Session on Monday(2/11), we modify our problem of the site
analysis. The chairman had came out with
the solutions to solve those problems. Chairman had rearranged the duty of the
members.
·
Update the information of the site analysis
All member are divided to three group.
·
Group 1 for the dimension (Tally information and location of
site analysis) :
Task A - Dimension and orientation site
Task F - Topography and landscape
Task G - Condition facility traffic and pedestrian
Task C - Profile of land and soil
·
Second Group 2 for facilities :
Task B - The existing structures in and around the
site
Task D - Services in the vicinity of the site
Task H - Public facilities
·
Third Group 3 for condition :
Task E-
Temperature, humidity and wind
Task I
- Obstacles on site and around the site
-Check and update
all the information and do or sketch into the A1 butter paper.
·
Ideas for pavillion
- Concept
of the design (from Sultan Azlan Muhibbuddin Shah)
- Reason for the location we build the
pavilion ( why not another spot )
- gallery (30%)
- Landscape/Garden (30%)
- Reception & lounge (
30%)
-Universal Design
(compulsory)
-Lay bys for drop off area
- must come out the idea of
the design and sketch into the butter paper for next meeting .
· Report update
- Chairman mention
secretary for updating the progress report
- Secretary need to walk
around and collect information for the report
- Every member must be read
the progress report in the blogspot
http://group4bsiteno8.blogspot.my
·
Prepare and print out pictures
- Any pictures
send to the secretary laptop and print it out, the pictures must show and paste in on butter
paper(easy to know)
Action: Aziman Raziq Bin Rizaman ( Chairman
)
Aimi
Zahirah Binti Zulkarnain
Lee
Ter Soon
Ng
Yii Rou
Nor
Syafiqah Athirah Binti Mohd Shaifulah
Wee
Chew Teng
Minute 3: Interaction between group member
·
The job scope of each majors which are the design-based and non-design
based members to carry out their work .
The job descriptions are as follow :
JOB DESCRIPTIONS
|
|
|
MAJOR
|
|
|
|
|
|
ARCHITECTURE
|
PLANNING
|
BUILDING
|
INTERIOR
|
CONSTRUCTION
|
QUANTITY
|
BUILDING
|
|
|
|
TECHNOLOGY
|
DESIGN
|
MANAGEMENT
|
SURVEY
|
SURVEY
|
Key plan&location
plan(NTS)
|
ü
|
ü
|
|
|
|
|
|
Site analysis
|
ü
|
ü
|
|
|
|
|
|
Precedent Studies
|
ü
|
ü
|
|
|
|
|
|
Conceptual Design
sketches
|
|
|
|
|
|
|
|
for building and site
planning
|
ü
|
ü
|
|
|
|
|
|
Bubbles diagrams for
building
|
|
|
|
|
|
|
|
and site planning
|
ü
|
ü
|
|
|
|
|
|
Site plan -scale 1:100
|
|
|
|
|
|
|
|
(with roof plan and
landscapes)
|
ü
|
ü
|
|
|
|
|
|
Floor plan (scale 1:50)
|
ü
|
|
|
|
|
|
|
Elevation(West,East,North&South)
|
ü
|
|
|
|
|
|
|
Horizontal and longtitudinal
section
|
ü
|
|
|
|
|
|
|
Foundation to roof
construction details
|
ü
|
|
ü
|
|
|
|
|
Floor plan and
sections(scale 1:50)
|
|
|
|
|
|
|
|
indicating basic building
services
|
|
|
ü
|
|
|
|
|
4 interior perspectives
drawings
|
|
|
|
ü
|
|
|
|
Design furniture and
cabinet
|
|
|
|
ü
|
|
|
|
2 exterior building
perspectives drawings
|
ü
|
|
|
|
|
|
|
1 exterior site plan
perspectives drawings
|
|
ü
|
|
|
|
|
|
Progress report
|
|
|
|
|
ü
|
|
|
Design proposal Report:
|
|
|
|
|
|
|
|
Construction report
|
|
|
ü
|
|
|
|
|
Material selection
|
|
|
|
|
|
ü
|
|
Building Services
|
|
|
ü
|
|
|
|
|
Topography related survey
|
|
|
|
|
|
|
ü
|
Elemental cost analysis
|
|
|
|
|
|
ü
|
|
Model cost estimation
Project 5c
|
|
|
|
|
|
ü
|
|
Project Scheduling
|
|
|
|
|
ü
|
|
|
Organisation role
|
|
|
|
|
ü
|
|
|
GBI report
|
|
|
|
|
|
|
ü
|
·
Achitecture assisted by all major with the design statement should be
lettering hand written to explian the concept of the design
approach,construction material etc. All the member of each major start to
distribute their job to carry out the project and the job descriotion will be
update .
Action: Chairman
The chairman closes the meeting with
remarks of thank you to the members who attend.
No comments: