MINUTE OF MEETING  GROUP 4B SITE NO.8

Date: 02 November 2015 (Monday)
Time: 12.00 pm
Venue: Studio RUS 104 100

______________________________________________________________

Presence:
Aziman Raziq Bin Rizaman ( Chairman )
Aimi Zahirah Binti Zulkarnain (Assist. Chairman)
Lee Ter Soon
Ng Yii Rou
Azreen Sabrina Binti Ab Halim
Faiz Solehin Bin Shafikhullah
Fatin Nabila Binti Abdull Rahman
Goh Su Chen
Hanisah Binti Amiruddin
Nur Nabilah Binti Mohamad Bakhtiar
Muhammas Hakeen Bin Mohd Mahayuddeen
Nor Syafiqah Athirah Binti Mohd Shaifulah (Secretary)
Wee Chew Teng (Assist.Secretary)
Nur Syahirah Binti Ali
Nurman Bin Razali
Tan Jo yen (Treasures)

Chairman Remark
The chairman begins the meeting with salam remarks and welcome to the members who present in the meeting.

Minute 1: Feedback from the lecturer about the progress
·         Discussion the problem of the site analysis with group member
·         All member of Group 4B are list down the problem of the site analysis that studio master give comment during the studio crit session.
·         All member are share and discussion about the problem of site analysis
Problem of the site and site analysis:
1.    The site is small ( small place )
2.    Is difficult for us to built a pavilion at the small place
3.    No parking area
4.    Data and information of the site collected incomplete
5.    Do not have a conclusion for the site analysis
6.    Conflicts on the main issue of the site
7.    Lack of communication and team work
8.    The area for the future development is not suitable because near to Y junction of the pathway.
·         All member of 4B are share the idea and find out the best way to solve the problem .

Action: All member of Group 4B
Minute 2: Distribution the work ( Next things we need to do )
After the Crit Session on Monday(2/11), we modify our problem of the site analysis. The chairman had came out with the solutions to solve those problems. Chairman had rearranged the duty of the members.
·         Update the information of the site analysis
  All member are divided to three group.
·         Group 1 for the dimension (Tally information and location of site analysis) :
Task A - Dimension and orientation site
Task F - Topography and landscape
Task G - Condition facility traffic and pedestrian
Task C - Profile of land and soil
·         Second Group 2 for facilities :
           Task B - The existing structures in and around the site
           Task D - Services in the vicinity of the site
           Task H - Public facilities
·         Third Group 3 for condition :
                      Task E- Temperature, humidity and wind
                      Task I   - Obstacles on site and around the site
       -Check and update all the information and do or sketch into the A1 butter paper.

·         Ideas for pavillion
        - Concept of the design (from Sultan Azlan Muhibbuddin Shah)
        - Reason for the location we build the pavilion ( why not another spot )
                    - gallery (30%)
                    - Landscape/Garden (30%)
                    - Reception & lounge ( 30%)
                    -Universal Design (compulsory)
                    -Lay bys for drop off area
                    - must come out the idea of the design and sketch into the butter paper for next meeting .

·       Report update
       - Chairman mention secretary for updating the progress report
       - Secretary need to walk around and collect information for the report
       - Every member must be read the progress report in the blogspot
         http://group4bsiteno8.blogspot.my


·         Prepare and print out pictures
        - Any pictures send to the secretary laptop and print it out, the pictures     must show and paste in on butter paper(easy to know)

Action: Aziman Raziq Bin Rizaman ( Chairman )
Aimi Zahirah Binti Zulkarnain
Lee Ter Soon
Ng Yii Rou
Nor Syafiqah Athirah Binti Mohd Shaifulah
Wee Chew Teng


Minute 3: Interaction between group member
·         The job scope of each majors which are the design-based and non-design based members to carry out their work .

The job descriptions are as follow :
JOB DESCRIPTIONS


MAJOR





ARCHITECTURE
PLANNING
BUILDING
INTERIOR
CONSTRUCTION
QUANTITY
BUILDING



TECHNOLOGY
DESIGN
 MANAGEMENT
SURVEY
SURVEY
Key plan&location plan(NTS)
ü
ü





Site analysis
ü
ü





Precedent Studies
ü
ü





Conceptual Design sketches







for building and site planning
ü
ü





Bubbles diagrams for building







and site planning
ü
ü





Site plan -scale 1:100







(with roof plan and landscapes)
ü
ü





Floor plan (scale 1:50)
ü






Elevation(West,East,North&South)
ü






Horizontal and longtitudinal section
ü






Foundation to roof construction details
ü

ü




Floor plan and sections(scale 1:50)







indicating basic building services


ü




4 interior perspectives drawings



ü



Design furniture and cabinet



ü



2 exterior building perspectives drawings
ü






1 exterior site plan perspectives drawings

ü





Progress report




ü


Design proposal Report:







Construction report


ü




Material selection





ü

Building Services


ü




Topography related survey






ü
Elemental cost analysis





ü

Model cost estimation Project 5c





ü

Project Scheduling




ü


Organisation role




ü


GBI report






ü

·         Achitecture assisted by all major with the design statement should be lettering hand written to explian the concept of the design approach,construction material etc. All the member of each major start to distribute their job to carry out the project and the job descriotion will be update .
Action: Chairman


The chairman closes the meeting with remarks of thank you to the members who attend.